The Four 2020 Projects

1. Retaining wall. 2. Steps. 3. Fence. 4. Concrete (patio, sidewalk, driveway extension).

Project work started: March 19, 2020                   Completion date:  TBD

Project Time: 7 Months running

Thumbnails link to larger images of current tasks or issues remaining


Left Side Jagged Steps
Left
                  Side Jagged Steps
Right Side Jagged Steps
JaggedRightSideSteps
Missing Fence Caps
FenceCaps
Finish Retaining Wall Caps
WallCaps
Retaining Wall Caps 2
FenceCaps
Damaged Path Repair
PathDamage
Path gravel
PathUnfinished
Bobcat Damage to Wall
DamageToWall
Bobcat Damage to Post
BobCatDamagePost
Tape and Concrete on House
TapeAndConcreteOnHouse
Fence dug out, not Reinforced
FenceCaps
Backside of Fence
FenceSupport
Backside of Fence 2
 
BacksideOfFence2
Gate and Post not level, Screws
FenceCaps
Concrete all over Barn
ConcreteOnBarn
Concrete on Front of House
ConcreteOnFrontOfHouse
Concrete on Front of House2
ConcreteonFrontofHouse2
Concrete on Garage Door
ConcreteOnGarageDoor
Concrete on Back of House
ConcreteOnBackofHouse
Concrete on Back of House 2
ConcreteOnBackofHouse
Concrete on Back Windows
ConcreteOnBackWindow
Neighbor's Yard
ConcreteOnBackofHouse
Neighbor's Yard 2
ConcreteOnBackofHouse
Concrete on Retaining Wall
ConcreteOnWall
Fence Post out of plumb
FenceOutOfPlumb
Fence Post out of plumb 2
FenceOutOfPlumb2
Diesel Spill by/on Path
DieselSpillbyPW
GeoGrid to Trim
DieselSpillbyPW
Concrete on Previous Pour 1
ConcreteOnPrev
Concrete on Previous Pour 1
ConcreteOnPrev
Concrete on Previous Pour 2
ConcreteOnPrev
Concrete on Previous Pour 3
ConcreteOnPrev
Concrete on Previous Pour 4
ConcreteOnPrev
Concrete on Previous Pour 5
ConcreteOnPrev
Chamfered Edge
ConcreteOnPrev
Footprints
Footprints
Pressure Washer Trail
Footprints
Fence Erosion 10/21/20
Fence Erosion
Fence Erosion 10/21/20
Footprints
Path Screw and Hole /21/20
Footprints
Path Disconnect 10/21/20
Footprints
Path Raised Rebar 10/21/20
Footprints